Concrete Calculator

2020-2-3 · Example calculation Estimate the quantity of cement, sand and stone aggregate required for 1 cubic meter of 1:2:4 concrete mix. Ans. Materials required are 7 nos. of 50 kg bag of cement, 0.42 m 3 of sand and 0.83 m 3 of stone aggregate.

contact us

Types of Stone Masonry | Types of Rubble Masonry and ...

2017-3-23 · The art of building a structure in stone with any suitable masonry is called stone masonry. Stone masonry may be broadly classified into the following two types: 1. Rubble Masonry 2. Ashlar Masonry. The stone masonry in which either undressed or roughly dressed stone …

contact us

POCKET GUIDE BRICK AND CMU CONSTRUCTION

2015-5-4 · Masonry Institute of Washington 10519 NE 38th Place, Building 12 Kirkland, WA 98033

contact us

Calculate Quantities of Materials for Concrete -Cement ...

2021-8-28 · Thus, the quantity of cement required for 1 cubic meter of concrete = 0.98/0.1345 = 7.29 bags of cement. The quantities of materials for 1 m3 of concrete production can be calculated as follows: The weight of cement required = 7.29 x 50 = 364.5 kg. Weight of …

contact us

RATE ANALYSIS OF CONSTRUCTION ITEMS

2014-1-8 · Sr.No. Material Code Material Description Qty Basic unit Rate Amount ----- 1. Cement 43 grade opc cement i/c 2.5% 1918.000 bags 240.00 460320.00 wastage 2. Sand River sand i/c 20% wastage 155.000 cu.mt 1230.00 190650.00 3. Metal-2 metal no 1 of size 20mm i/c 5% wastage 106.000 cu.mt 775.00 82150.00 ...

contact us

Brick Masonry Calculator | Clay Brick Calculator | Brick ...

Brick masonry calculator calculates the number of bricks and mortar required for a given wall area. Based on wall length, wall height/depth, wall thickness, Brick Size & Cement concrete Ratio, it calculates the number of bricks, quantity of cement in Bags & quantity …

contact us

BILL OF QUANTITIES FOR PROPOSED BUILDING & CIVIL …

2015-11-30 · O Kerb stones and parking 75 to 150mm girth with Kenya Power branded colours. LM 178 Cable ducts P Supply and install 150mm diameter heavy gauge PVC pipes as ducts for cables crossing the access road and control room cable trench entrance location. LM 72 Q Vibrated mass concrete class 20/25 (1:2:4) in pvc cable ducts surrounding. CM 2

contact us

Analysis & Rates, Analysis and rates for construction work ...

3)Reinforcement work for R C C –1 blacksmith or fitter and 1 beldar can bend and place in position 1 quintal (2 cwt) of steel per day. d) Stone work per 2.83 cum (100cuft)- Random rubble masonry with blue stone in foundations-3 masons, 3 beldars, 2 mazdoors and 1/4bhisti can do 2.83 cum (100cuft0 per day . e) Brick work per 2.83 cum (100cuft)-

contact us

Estimate FOR THE SEPTIC TANK

2012-5-10 · Cum; Same as above, but filling with contractor''s locally available filling ... reinforcement of various diameter. for R.C.C. work as per detailed designs, drawings & schedules or as directed including straightening, cutting, bending, hooking the bars ... brick or stone masonry surfaces, ceilings including roughening concrete surface ...

contact us

IS 2116 (1980): Sand for masonry mortars

2018-2-1 · IS:2116-1980 ( Continuedfrom page 1 ) Members Representing Saar B. S. GREWAL Public Works Department, Government of Punjab, Chandigarh SHBI R. L. KUMA~ Institution of Surveyors, New Delhi SARI K. S. KHARB ( Alternate) SERI M. Z. KURIEN Tata Consulting Engineers, Bombay

contact us

IS 1597-1 (1992): Construction of Stone Masonry

2018-11-14 · igneous rocks, lime stone ( including marble ), sandstone, etc. For the properties of these types of stones reference may be made to IS 1123 : 1975. 5.1.2 Quality All stones used for building purposes shall be strong, hard and durable as indicated in 5.1.2.1 and 5.1.2.2. 5.1.2.1, Strength

contact us

How To Calculate Cement, Sand & Aggregates Quantity in ...

2018-8-3 · CALCULATION FOR AGGREGATE QUANTITY. Consider volume of concrete = 1m3. Dry Volume of Concrete = 1 x 1.54 = 1.54 m3. Aggregate = (3/5.5) x 1.54 = 0.84 m3 ∴ 3 is a part of cement, 5.5 is sum of ratio. Density of Aggregate is 1500/m3. Calculation for KG = 0.84 x 1500 = 1260 kg. As we know that 1 m3 = 35.31 CFT.

contact us

What Is Rubble Masonry | Coursed & Uncoursed Rubble ...

2020-7-29 · The stones used here are mostly without prominent stratification. These stones are embedded in the facing to show the irregularity of face joints in all directions for aesthetic appeal. It is mostly similar to Course Rubble Masonry of the first sort. Arrangement of Stones…

contact us

DESIGN AND DETAILING OF RETAINING WALLS

2014-1-2 · at one level where the steel quantity is about 50% or 67% of the base steel. Effective depth is Proportional to h Bending moment is proportional to h3 Ast is α l to BM/Eff. depth and is αl to h2 2 2 2 1 2. . 1 h h A A i e st st tp= (1 /3-1/4)b H 200 b= 0.4H to 0.6H H/10 –H/14

contact us

SCHEDULE OF ITEMS & QUANTITIES FOR CIVIL WORKS …

2019-7-29 · Cum 4 101.50 406.00 CONCRETE WORK 4 4.1 Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work up to plinth level. 4.1.3 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) Cum …

contact us

How to calculate cement sand quantity in 1:6 mortar ...

2021-8-27 · How to calculate cement sand quantity in 1:6 mortar meaning of mix 1:6 mortar:-in this mix ratio of cement and sand in which one part is cement and 6 part is sand and by adding water.Water is added in mix mortar in about 20% of its dry volume.

contact us

IS 2250 (1981): Code of Practice for Preparation and Use ...

2018-11-14 · IS : 2250 - 1981 1. SCOPE 1.1 This standard covers the preparation of masonry mortars and their use in masonry works. NOTE-Use of mud mortars, gypsum mortars and bituminous is not covered in this standard. 2. TERMINOLOGY 2.0 For the purpose of this standard, following definitions in addition to those given in IS : 6508-1972* and IS : 4305-1967t shall apply.

contact us

BILL OF QUANTITIES

2015-6-4 · Cum 167.04 3.20 A/R Providing and Laying PCC (M25) under the deck slab as per drawing. Cum 63.48 3.21 SM0072 Providing and laying Hand packed stone filling or soling with stones. Cum 163.70 3.22 CW0011 Providing and laying in position plain cement concrete excluding the cost of centering and shuttering ‐ All work upto

contact us

Brick and Block Masonry: Proceedings of the 16th ...

2016-8-12 · Brick and Block Masonry - Trends, Innovations and Challenges contains the lectures and regular papers presented at the 16th International Brick and Block Masonry Conference (Padova, Italy, 26-30 June 2016). In an ever-changing world, in which innovations are rapidly implemented but soon surpassed, the challenge for masonry, the oldest and most traditional building material, is that it can ...

contact us

APPENDIX-I QUANTITIES OF MATERIALS FOR …

Cut Stone 0.03 cum 1.00 cum 27 Fixing fine dressed cut stone copings, cornices, string courses and plinth coursed in mortar. cum Cut Stone Mortar 1.00 cum 0.12 cum 28 Stone brick masonry with solid stone masonry blocks pre-cast in C.C. 1:4:8. cum Pre-cast Blocks Mortar 0.90 cum 0.12 cum ...

contact us

Brick Masonry Calculator | Clay Brick Calculator | Brick ...

Brick masonry calculator calculates the number of bricks and mortar required for a given wall area. Based on wall length, wall height/depth, wall thickness, Brick Size & Cement concrete Ratio, it calculates the number of bricks, quantity of cement in Bags & quantity of sand required in Ton.

contact us

STONE MASONRY

2018-1-11 · General Principles The stones to be used for stone masonry should be hard, tough and durable. The pressure acting on stones should be vertical. The stones should be perfectly dressed as per the requirements. The heads and bond stones should not be of a dumb bell shape. In order to obtain uniform distribution of load, under the ends of girders, roof trusses etc

contact us

Rate Analysis of Brick Masonry

2021-8-25 · Calculation of Brick for Rate Analysis of Brick Masonry. The volume of 1 brick with mortar = 200 x 100 x 100 ( 10 mm mortar thickness on all sides) Therefore, Number of bricks required for 1 Cum (m 3 ) = 1/0.002 = 500 Nos. Requirement of brick 10 cu.m. = 500 nos (1 cu.m = 500 nos. of brick) x 10 cu.m.

contact us

Concrete Masonry Block | Masonry and Concrete Calculators

2010-3-29 · Use this calculator to calculate the amount of concrete block needed to construct a masonry wall. To calculate the quantity of brick or block you need to know what size block or brick you want - the unit dimensions that matter to your quantity is length and height - width won''t change the quantity…

contact us

Brick Masonry Calculator | Brick Masonry Calculator | Size ...

2021-8-27 · This find as per the below step. Step – 1. Select unit like Meter or Feet as per required in below picture. Step – 2. After select unit then enter Length and Width in working area of brick masonry shown in below picture. Step – 3. After filling Unit, length, width then fill wall thickness. Fill wall thickness as per your requirement like ...

contact us

(PDF) Modeling and Analysis of Masonry Structures

weak-type of structure such as masonry structures. Nonlinear modeling and analysis offers a better al-. ternative since it can be performed without the need. to induce forces to the existing ...

contact us

Rate Analysis for Cement Mortar -Calculate Quantity and Cost

🕑 Reading time: 1 minute Rate analysis for cement mortar requires estimation of materials for cement mortar, i.e. quantity of cement and sand required for 1m 3 for various proportions, i.e., CM 1:2, 1:4, 1:6, 1:8 etc. So, let us first calculate quantity of cement and sand required for 1m 3 of cement mortar. For 1m 3 of wet cement mortar, 1.3m 3 of cement and sand is required, due to ...

contact us

How much cement and sand required for mortar 1:4?

2021-8-27 · 4) calculation of cement quantity. 5) calculation of sand quantity. How to calculate dry volume of mortar 1:4 given data:-Assume volume of mortar = 1m3. Density of cement = 1440 kg/m3. Cement in 1 bag = 50 kg. 1m3 = 35.3147 cubic feet. Mix ratio is = 1:4 ( one part is cement and 4 part is sand) Total proportion = 1+4= 5. Part of cement = 1/5 ...

contact us

Copyright © 2007- AMC | Sitemap